False Claims Act and cybersecurity after the CMMC pause

False Claims Act and cybersecurity after the CMMC pause

Compare cyber FCA settlements, the knowledge and materiality tests, and current SPRS reporting duties before signing a cybersecurity affirmation.

Deep Fathom Last verified

A knowingly false SPRS score or cybersecurity affirmation can support False Claims Act liability when the legal requirements, including materiality, are met. A low score alone does not establish that liability, and a settlement does not establish every allegation as fact. The July 2026 CMMC Phase 2 suspension changed assessment requirements without removing the underlying NIST SP 800-171 baseline described in the implementing deviation. Contractors should compare their actual contract, posted representation and supporting evidence before signing or renewing an affirmation. Current contract requirements, including applicable self-assessment reporting and annual affirmations, still need attention.

Status as of October 5, 2026. This reference separates historical enforcement cases from current contract requirements. A paused assessment schedule doesn’t make an inaccurate SPRS record safe.

Can a false SPRS score or affirmation create False Claims Act liability?

Yes, but the legal elements matter. 31 USC 3729(a)(1)(A)–(B) addresses knowingly presenting a false or fraudulent claim and knowingly making or using a false record or statement material to such a claim. Under subsection (b)(1), knowledge includes actual knowledge, deliberate ignorance and reckless disregard. Specific intent to defraud is not required.

That isn’t a rule that every cybersecurity gap equals fraud. In Universal Health Services v. Escobar, 579 U.S. 176, 194–195 (2016), the Supreme Court explained that materiality is demanding. Describing a requirement as a condition of payment is relevant, but not automatically decisive. Minor or insubstantial noncompliance does not satisfy the standard the Court described.

“The materiality standard is demanding.” Escobar, p. 194

The statute provides for civil penalties and three times the government’s damages, subject to its terms. Don’t estimate exposure by multiplying a score deficit by a settlement amount. A score measures something different from damages.

In Deep Fathom’s view, treat the posted record as something that needs evidence behind it. The useful comparison is between the representation, the system boundary and the requirements in the signed contract. For the underlying contracting review, start with the requirements matrix.

What cyber FCA settlements has DOJ reached?

The cases below concern different conduct. A settlement is evidence of an enforcement action, not a ruling on every allegation. MORSECORP’s release specifically identifies admitted facts. The other listed releases describe allegations and state that there was no determination of liability.

DOJ announcementAmountConduct described by DOJImportant qualification
Aerojet Rocketdyne, July 8, 2022$9 millionAlleged misrepresentations about compliance with cybersecurity requirements in federal contracts.Settled on the second day of trial. Allegations only, no liability determination.
Penn State, October 22, 2024$1.25 millionAlleged failures to implement required controls and plans, inaccurate remediation dates and use of a nonqualifying cloud service.Involved 15 defense and NASA contracts or subcontracts. Allegations only, no liability determination.
MORSECORP, March 26, 2025$4.6 millionMORSE posted 104 in January 2021. A consultant advised in July 2022 that its score was −142. The score was not updated until June 2023.DOJ identifies these as admitted facts, alongside cloud, control and system-security-plan failures.
Georgia Tech Research Corporation, September 30, 2025$875,000Alleged antivirus and system-security-plan failures, plus a campus-wide score of 98 based on a fictitious or virtual environment.DOJ alleged the score did not describe an actual covered contracting system. Allegations only, no liability determination.
LOGZONE, June 18, 2026$507,144Alleged control failures on two Navy contracts. A government assessment produced −170.The release does not establish a prior perfect score. Allegations only, no liability determination.
Honeywell Aerospace, September 1, 2026$2,042,518Alleged NIST SP 800-171 failures on one network from April 2020 through December 2023.This release describes contract cybersecurity failures, not a specific false SPRS score. Allegations only, no liability determination.

Read the underlying conduct. These settlements should not be compressed into a claim that every case involved a false CMMC affirmation. Nor should the historical amounts be used to predict the outcome of a new matter.

What do 7019, 7020, 7021 and the affirmation rules require now?

Older articles discuss DFARS 252.204-7019 and 252.204-7020 as the source of Basic assessment posting duties. That history needs a date. Deviation 2026-O0025 Revision 3 supplies the revised Part 240 text and clause prescriptions that contracting officers must use. Its 252.240-7997 clause addresses government Medium and High assessments, including government posting of scores. It does not impose the old Basic self-assessment posting procedure.

There is a separate CMMC reporting obligation. Where the contract includes the applicable 252.204-7021 requirements, paragraphs (e)(2)–(3) require current self-assessment results in SPRS for applicable systems and annual affirmations of continuous compliance. Paragraph (d)(3) also requires the affirmation to be maintained as current. The clause expressly references the affirmation framework in 32 CFR 170.22.

Check the contract itself. The deviation’s memorandum, pages 2–3, directs removal of suspended requirements from existing contracts before the next option exercise or through the next scheduled administrative modification. It also states that the NIST SP 800-171 Rev. 2 baseline continues under 252.204-7012. A policy announcement should not be treated as proof that a particular contract has already been modified.

The CMMC overview provides broader program context. For this decision, retain the actual clause version, applicable system identifier and most recent modification with the affirmation review.

Who needs to review a subcontractor’s false self-assessment?

A subcontractor’s role does not resolve the legal question by itself. Section 3729 also addresses causing a false claim or material false record. Whether particular conduct satisfies those elements needs a case-specific assessment.

For current contractual duties, 252.204-7021(d)(4) addresses subcontractor and supplier affirmations before award and annually. Paragraph (f) addresses flowdown when a subcontract requires processing, storing or transmitting FCI or CUI. Its COTS exclusion and the actual subcontract terms matter.

The same caution applies to owners and acquirers. Do not infer automatic liability, or immunity, from an ownership label. Our recommended diligence question is concrete: which representations will the business rely on, and what evidence supports each one? The subcontractor flowdown guide can help locate the contracting questions that need resolution.

We paused compliance work, who do we tell?

Start by identifying what changed. Pausing a project, discovering an inaccurate posted score and failing a contractual requirement are different events. None should be described with a reassurance that the records do not support.

We recommend this review sequence:

  1. Preserve the current SPRS record, affirmation, system boundary and underlying technical evidence. Keep the dates so later reviewers can reconstruct what was known when.
  2. Compare that record with the signed contract and subsequent modifications. Identify the exact representation that may be inaccurate.
  3. Bring the discrepancy to the responsible security and contracts officials, with qualified counsel assessing any disclosure or correction duty. Do not substitute this article for that legal determination.
  4. Record the disposition, responsible owner and follow-through. Where a correction is required, retain evidence that it was made rather than treating an assigned task as closure.

The FAR 52.203-13 disclosure and ethics article covers that separate clause analysis. Use it with counsel to determine the applicable recipient and timing. A general decision to pause CMMC work is not enough information to prescribe one universal notification.

References and reading boundaries

The statutory definitions above use the official 2024 Code edition, §3729. Current House preliminary pages returned maintenance responses during this review. The Supreme Court opinion supplies the cited materiality discussion, and the September 2026 deviation supplies current prescribed contracting text. Every case row links to its own DOJ release. The table is a selected comparison, not an exhaustive enforcement census.