Requirement guide Bid eligibility
Is CMMC required at proposal or award?
The November 2025 DFARS 252.204-7025 provision requires the stated CMMC level or higher before award, with a current status and affirmation in SPRS, and asks for relevant CMMC unique identifiers in the proposal. DFARS 252.204-7021 addresses maintaining the required status during performance. Read the specific package for separate access or submission conditions: an award checkpoint does not automatically postpone every other requested item. Record each checkpoint separately and ask the contracting officer about inconsistencies.
Decision basis: DFARS 252.204-7021DFARS 252.204-7025 (November 2025)
What to confirm
Requirements can change by amendment or flowdown. Counsel or the contracting parties interpret a particular solicitation.
Continue the review
- Build a requirements matrix
Keep access, submission, award and performance checkpoints separate.
- Review the Phase II suspension
Apply the dated policy direction to the document review.
Organize the requirement, work, and evidence.
Deep Fathom records the source requirement, accountable owner, assigned work, supporting evidence, and review history. The team can then review the specific requirement instead of searching across disconnected documents.
Review bid requirements