Guide Pursuit review

How to review an approved-source requirement

Identify the item, approving authority, qualification path and award checkpoint behind a solicitation's approved-source condition.

Reviewed · Deep Fathom

Wide tables scroll sideways to show all columns.

An approved-source condition asks a different question from whether your company can manufacture a similar part: has the required source or product qualification been established for this procurement? Read the condition, identify the approving authority and determine what evidence the buyer will accept.

A matching product code, a past award or a quality certification is not a substitute for the specific approval being requested.

Identify the object of approval

Write down exactly what must be approved. It may be a product, manufacturer, process or source under a particular qualification arrangement. Capture the item identifier and revision, named approval authority, applicable list or qualification standard, and the solicitation paragraph.

Do not assume approval for one part covers another part in the same commodity. Similarly, a distributor’s relationship with a manufacturer needs evidence appropriate to the buyer’s requirement.

Check whether there is a qualification path

FAR 9.202 addresses qualification requirements and opportunities to demonstrate qualification. Its conditions can permit consideration of an offer from a source that can meet the standards before the specified award date. The same section says the contracting officer need not delay a proposed award to allow a prospective offeror to qualify.

Those provisions do not promise that a new source can finish qualification in time. Ask for the applicable process, required evidence and checkpoint. Use the current agency instructions and the actual solicitation rather than a general internet description of source approval.

A source-approval review worksheet

FieldWhat belongs in the record
Item and configurationNSN or part number, drawing/revision and the product being offered
Source conditionExact text and source locator
Approval authorityOffice or authority named in the package
Current evidenceApproval document or list entry, with scope and date
Alternative pathWhether a new-source qualification process is described
Timing questionWhen qualification must be established and whether the schedule supports the work
Decision ownerPerson responsible for confirming the interpretation and pursuit effect

A blank current-evidence field is an open question. It should not become “approved” because a search result shows the company name near the item.

A dated example of a separate procurement condition

The retained F-16 ammunition notice family describes an engineering source-approval condition alongside cybersecurity language. It illustrates why a CMMC review cannot settle the whole pursuit. Read the dated campaign case.

The August notice actions also differ in response context. Do not use an earlier expression-of-interest date as though it were the final offer deadline, or assume a later posting proves a simple extension. Review the package and its history before deciding what approval and submission path applies.

Make the pursuit decision explicit

Separate “we have the approval,” “we have a documented path to seek approval,” and “we have not established a path.” Then examine the cost and time of that work alongside engineering and commercial considerations.

The requirements matrix records the detailed evidence. The bid checklist records the decision. These are educational resources. Deep Fathom does not grant engineering source approval or offer an approved-source matching product on this page.

Primary policy and retained example reviewed September 7, 2026. Apply the actual qualification regime and incorporated requirements.